Running preliminary and final cost calculation

Use the month-end workspace to review and execute calculations. Selecting a month or generating a cost report does not complete cost calculation. Earlier periods and other operations may need processing first.

Before you start​

Review the period’s purchase, sales and warehouse documents and the expense-allocation inputs. Keep the current quantity and cost reports for comparison. Check the affected companies and historical documents before starting an operation that reposts financial records.

Select the period and mode​

  1. Open Profitability & cost > Month-end closing. The form is titled Month-end procedures.
  2. Select Month and Mode: Preliminary closing or Final closing.
  3. For preliminary closing, check by date within the selected period. Use the intended calculation date.
  4. Review the diagnostics and any Recalculation required period. The required starting period can be earlier than the month selected in the header.

Resolve dependencies before calculation​

Open the available Details links and review each required operation. Check missing or changed source documents and preceding periods. Cost calculation can depend on earlier cost periods and unfinished customer/vendor AR/AP calculations.

Do not assume that selecting a later month skips those dependencies. If historical reposting is required, review its scope and source data with the person responsible for accounting before execution.

The workspace provides the following operation groups and commands. The list depends on the selected mode and required work:

GroupOperationCommand
Additional document postingCalculate document amounts in accounting currencies and repost in financial registersRun
AR/AP accounting and currency revaluationCalculation of exchange differences for customer and vendor AR/APRun
AR/AP accounting and currency revaluationRevaluate cash and financial instrumentsRun, Details; final closing
Cost calculationCost allocation and cost calculationCalculate
Profitability & cost generationGenerate VAT recordsGenerate
Profitability & cost generationGenerate expense allocation documentsRegister, Details; final closing
Balance sheet statementRecord balance sheet statement entriesRun; where required in preliminary closing

Run and check the required operations​

  1. After resolving prerequisites, use the command for the intended operation or Run procedures for the reviewed scope.
  2. Wait for the operation status to finish updating. Inspect errors and Details where offered; starting an operation is not confirmation of completion.
  3. Review any remaining dependencies or recalculation requirements before proceeding to later operations.
  4. Open Cost calculation recorders in Profitability & cost and inspect the records relevant to the period.

Reconcile the result​

Generate the quantity and inventory-cost reports again with the same period, company scope, units and currency basis. Compare receipt, issue and closing costs and any allocated expenses.

A blank issue cost is not a confirmed zero. If values still do not reconcile, inspect the source documents, operation results and allocation inputs. Do not treat month-end execution as proof that every valuation issue has been fixed, or substitute a proportional cost for a missing calculated value.